by Revo Group Admin | Dec 13, 2021 | Engineering, Innovation
With the new AS/NZS 7000 standards coming into effect in 2016, many utilities saw their pole foundation requirements increasing in depth and diameter. As a result, designers and site crew lost faith in the software being used. Revo Group has developed a new pole...
by grantbaileyrevogroupaucom | Nov 12, 2021 | Engineering
What was Revo Group contracted to do? Revo Group was contacted by Navara Projects to see if it was possible to remove a stay wire and ground anchor from a private property. The ground anchor was located approximately 8 metres inside the property boundary. Our...
You must be logged in to post a comment.